April 1940

Started the manufacture and sale of acetylene gas welded steel tubes for bicycles in Yokosuka town (currently: Tokai city), Chita District, Aichi Prefecture.

January 1952

Established Okajima Pipe Co., Ltd. with 1 million yen of capital.

August 1962

Purchased a high-frequency resistance welding machine manufactured by US-based Summertool Inc. for the first time in Japan

December 1968

Purchased 25,000 m2 of land in Higashiura town, Chita District, Aichi Prefecture, constructed Building No. 3 & No. 4 of Higashiura Plant No. 2 (3,500 m2) and operated five tube making machines as well as two drawing machines

January 1969

Imported an automatic drawing machine manufactured by West Germany-based Kirsaling GmbH for the first time in Japan

May 1972

Constructed Building No. 2 at Plant No. 2 (1,700 m2) and installed three more tube making machines

March 1980

Constructed Building No. 1 at Plant No. 3 (2,200 m2), moved three drawing machines and started operations as a tube making plant

January 1982

Started production of pipe in coil (PIC)

October 1982

Installed ERW tube making machine (F1)

August 1983

Extended Building No. 1 (1,400 m2) of Plant No. 2 and built No. 2 Office (200 m2)

November 1985

Constructed Building No. 2 at Plant No. 3 (1,513 m2)

November 1986

Constructed an Employee's Hall (OP Hall) (946 m2)

September 1987

Installed ERW tube making machine (F2)

September 1988

Installed dedicated high-nickel and stainless-steel tube making machine

November 1989

Established Top Tube Manufacturing Co., Ltd. in Thailand

October 1990

Installed small-diameter, thin-walled PIC tube making machine (F4)

May 1991

Constructed multi-story, humidity-controlled warehouse (1,300 m2, 1,400-ton capacity)

July 1992

Installed dedicated stainless-steel tube making machine (S2)

April 1993

Constructed a company dormitory (Green Heights)

January 1994

Installed dedicated small-diameter, thin-walled tube making machine (S1) manufactured by CSM of Italy

April 1997

Constructed Plant No. 1 (4,300 m2) and started commercial operation of a private power generator (1950 kw)

December 1998

Installed dedicated small-diameter, thin-walled tube making machine (S4) manufactured by CSM of Italy

January 2002

Received the Special Recognition Award of the 35th Medium and Small Business Research Institute Award (currently, "Good Company Award")

November 2002

Installed ERW tube making machine (F10)

October 2003

Installed dedicated stainless-steel tube making machine (S5)

December 2003

Higashiura Plant was granted the ISO 9001 certification

August 2004

Installed dedicated small-diameter, thin-walled tube making machine (S6) manufactured by CSM of Italy

June 2005

Installed ERW tube making machine (F11)

April 2006

Selected in "300 of Japan's Vibrant Monozukuri (Manufacturing) SMEs" issued by METI

October 2007

The Head Office and Higashiura Plant were granted the ISO 14001 certification

April 2008

Renewed the non-oxidation annealing furnace

January 2009

Built new staff parking lot at the front entrance of Higashiura Plant

September 2010

Constructed Plant No. 4 (3,600 m2) and integrated off-line processes

November 2013

Established PT. TOP TUBE INDONESIA in Indonesia

February 2016

Installed ERW tube making machine (F12)